Subcontracting Notices
Any available & active subcontracting notices will be available here. If none appear, all are currently closed.
BRT Stations Regulatory & Facility Signage
Due Date: 05/11/2026
Skanska is soliciting all interested subcontractors, as well as certified Small, Veteran, Minority & Woman owned BUSINESS ENTERPRISES for RFP 28.14 Brickyard to SR 527 – BRT Stations Toilet & Custodial Accessories.
Due Date: 04/27/2026
Skanska is soliciting all interested subcontractors, as well as certified Small, Veteran, Minority & Woman owned BUSINESS ENTERPRISES for RFP 28.18 Brickyard to SR 527 – BRT Stations Fire Protection Specialties.
Due Date: 04/27/2026
Phase 1 scopes for the Renton High School Replacement include: BP 02A – DEMOLITIONBP 21A – FIRE PROTECTIONBP 31A – EARTHWORK & UTILITIESBP 31D – PHASE 1 ASPHALT & STRIPINGBP 32B – EARLY WORK SITE CONCRETEBP 32C – PHASE 1 LANDSCAPE
Due Date: 04/21/2026
Project Description: Construction of structural, electrical, mechanical, and civil improvements to the existing 4.0 MG Hawks Prairie Reservoir including rafter and roof repairs, replacing reservoir appurtenances, updating cathodic protection system, electrical upgrades, full interior and exterior coatings and containment, new foundation and anchor chairs, new vaults and connections, water line installation, fire hydrant, new asphalt pavement, retaining wall, concrete pad, and additional site improvements.
Scope of Work: Demolition; Earthwork and Utilities; Fencing; Landscaping; Site Concrete; Asphalt Paving; Cast in place Concrete; Rebar; Structural Steel Fabrication and Installation; FRP Grating; Vault Hatches; Painting/Coating; Water Utility Storage Tank (Appurtenances and Renovations/Rehabilitation); Mechanical/Plumbing/Piping and Appurtenances; Electrical; Instrumentation and Controls; Cathodic Protection
Scope of Work: Demolition; Earthwork and Utilities; Fencing; Landscaping; Site Concrete; Asphalt Paving; Cast in place Concrete; Rebar; Structural Steel Fabrication and Installation; FRP Grating; Vault Hatches; Painting/Coating; Water Utility Storage Tank (Appurtenances and Renovations/Rehabilitation); Mechanical/Plumbing/Piping and Appurtenances; Electrical; Instrumentation and Controls; Cathodic Protection
Due Date: 04/21/2026
Mortenson and EvergreenHealth are requesting bids from firms interested in providing the below services for a phased surgery expansion GC/CM project in an occupied acute care public hospital.
- Select Demolition
- Fire Protection
- Pneumatic Tube
- Floor Leveling
Due Date: 04/20/2026
Skanska is soliciting all interested subcontractors, as well as certified Small, Veteran, Minority & Woman owned BUSINESS ENTERPRISES for RFP 28.16 Brickyard to SR 527 – BRT Stations Painting and Coating.
Due Date: 04/14/2026
Provide and install all Furniture, Fixtures & Equipment defined in the Bid documents for new 48,639 square foot administration office building. Level one is 31,045 square feet and consists of the following: parking garage; pre-engineered metal building for additional covered parking; board room and community space; mechanical and electrical rooms and restrooms. Level two is 17,594 square feet for offices, restrooms, wellness space and break rooms.
Due Date: 04/13/2026
Skanska is soliciting all interested subcontractors, as well as certified Small, Veteran, Minority & Woman owned BUSINESS ENTERPRISES for RFP 28.11 Brickyard to SR 527 – BRT Stations & Platforms – Tile and Rubber Base.Join the RFP(s), Download Documents & Submit Bids at: https://bit.ly/bidbrickyardAll relevant project information including plans and specifications can be found in the documents on BuildingConnected. Plans and specifications are available for viewing at our office by appointment, contact Teresa Maxwell at teresa.maxwell@skanska.com or 213-598-2237 to schedule or download free in BuildingConnected. Please return your bid and submit RFIs on BuildingConnected. If you need assistance getting access to BuildingConnected feel free to contact me directly at courtney.mcghee@skanska.com or 206-817-5937 and danica@redteam-go.com or 206-947-1992.This project has 5% SBE, 3% VOB, 10% MBE and 6% WBE participation goals. Skanska will select based on best value from all interested subcontractors submitting proposals, including SBE/VOB/MBE/WBE firms on this project. If you are a SBE/VOB/MBE/WBE firm, please indicate this with your proposal. All interested subcontractors, please indicate all lower tier SBE/VOB/MBE/WBE participation offered on your proposal as it will be evaluated with your price for best value. If you have any questions or need assistance, please reach out to Danica Mason at danica@redteam-go.com or 206-947-1992.Skanska will assist qualified subcontractors, vendors, & suppliers in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. To permit maximum participation, when feasible Skanska will review breaking out scope packages and adjusting schedules to help permit maximum participation of SBE/VOB/MBE/WBE on the project. Subcontractor may be requested to furnish a bond, if required Skanska will pay bond premium up to 1%.Please call if we can assist you in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies.Register for an e-newsletter of future bid opportunities at https://bit.ly/PNW_interestedbiddersSkanska is an EEO/AA/Vet/Disability Employer.On behalf of the Skanska team, thank you for your interest in our project.Kind Regards,
Due Date: 04/10/2026
Flatiron Dragados Constructors, Inc. is requesting FSBE subcontractor/supplier participation for the following Items of work, but not limited to: Permanent Signage, Bridge Demo, Clear & Grub, Erosion Control (Temp & Perm), Landscaping/Irrigation, AC Paving, AC Milling, Drilling, Joint Seal Assembly, Rebar, Overhead Signs, Painting/Concrete Staining, AC Dike or Curb, Underground Utilities, Fencing, Metal Railing, Guardrail, Bridge Concrete Barrier, Roadway Concrete Barrier, Striping/Markings, Electrical, Minor Concrete, Furnish/Erect Precast Girders, Shoring/Excavation, Asphalt Membrane Waterproofing, Base and Ballast Aggregates, Concrete Pumping Services, Misc. Iron and Steel, Trucking, SWPPP Plan and Materials, Geotextile Materials, Bridge Bearings, MSE Wall Material, Street Sweeping, Traffic Control, and Dewatering!
Due Date: 04/10/2026