Subcontracting Notices
Any available & active subcontracting notices will be available here. If none appear, all are currently closed.
Flatiron Dragados Constructors, Inc. IS BIDDING THIS PROJECT AS A PRIME BIDDER and is requesting MWBE subcontractor/supplier participation for the following Items of work, but not limited to: Roadway Signs, Clear & Grub, Erosion Control (Temp & Perm), Landscaping/Irrigation, AC Paving, AC Milling, Drilling, Rebar, Underground Utilities, Fencing, Metal Railing, Guardrail, Bridge Concrete Barrier, Roadway Concrete Barrier, Striping/Markings, Electrical, Minor Concrete, Masonry, PCC Paving & Grind PCC Pavement, Saw & Seal PCC, PCC Paving & PCC Demo, Aggregates, Ready Mix, Concrete Pumping Services, Underground Pipe Products, Furnish Misc. Metals / Iron / Structural Steel, Trucking, SWPPP Plan & Materials, Geotextile Materials, Underground Precast, Street Sweeping, Traffic Control, Dewatering, Vibration Monitoring, Shoring/Excavation, Surveying and QC Testing.
Due Date: 08/12/2026
Hensel Phelps, the General Contractor / Construction Manager (GC/CM) selected by the Port of Seattle (the Port) for the S Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport (SEA), requests bids from responsible, qualified, experienced firms for the scopes of work described in this Bid Package. Hensel Phelps intends to award subcontracts utilizing the process as authorized by RCW 39.10.380. This request for bids is expressly conditioned upon the Port and GC/CM agreeing on a Maximum Allowable Construction Cost (MACC) and entering into a GC/CM Contract. If a MACC is not agreed upon, or if a GC/CM Contract is not executed between the Port and the GC/CM, neither the GC/CM nor any Bidder or Subcontractor shall have any claim against Hensel Phelps or the Port whatsoever. All costs incurred by firms participating in this bid package process shall be borne by the participating firms. Hensel Phelps and the Port reserve the right to waive any deficiency, informality or irregularity in any Bid received.
Demolition and Abatement, Building Concrete – Retrofit, Structural Steel, Metal Stairs and Railings, Fire Suppression, Site Paving, Runway and Taxiway Marking, Site Demolition and Earthwork, Deep Foundations, Site Utilities, Aviation Fueling Systems, Baggage Handling Systems
Demolition and Abatement, Building Concrete – Retrofit, Structural Steel, Metal Stairs and Railings, Fire Suppression, Site Paving, Runway and Taxiway Marking, Site Demolition and Earthwork, Deep Foundations, Site Utilities, Aviation Fueling Systems, Baggage Handling Systems
Due Date: 08/11/2026
Skanska is soliciting all interested subcontractors and suppliers, as well as certified Small, Veteran, Minority & Woman owned companies for the bid package: Masonry
Due Date: 07/31/2026
Skanska is soliciting all interested subcontractors and suppliers, as well as certified Small, Veteran, Minority & Woman owned companies for the bid package: Metal Panels
Due Date: 07/31/2026
Skanska is soliciting all interested subcontractors and suppliers, as well as certified Small, Veteran, Minority & Woman owned companies for the bid package: Doors (Supply & Install)
Due Date: 07/31/2026
Absher Construction General Contractor/Construction Manager (GCCM) is requesting subcontractor bids for the bid packages referenced above for the Timberline High School CTE Annex. All bids must be submitted on the proper Bid Form included in the bid documents and must be submitted in-person
Scope of Work:Bid Package 02.00 – Demolition
Scope of Work:Bid Package 02.00 – Demolition
Due Date: 07/20/2026