
SUBCONTRACTING OPPORTUNITY
Renton High School Replacement Project – MACC-04
POSTING DATE: 10/19/2026
DEADLINE FOR SUBMITTING BIDS: 12/02/2026, 10:00 am
Find the full solicitation on www.bxwa.com
Contract Location: Renton, WA
Contract description:
RENTON HIGH SCHOOL REPLACEMENT PROJECT
MACC 04 – Main Construction Bid Group 1:
- BP 01F – FINAL CLEAN
- BP 07A – ROOFING
- BP 09C – FLOORING – TILE
- BP 09D – FLOORING – RESILIENT & CARPET
- BP 09E – ACOUSTIC CEILINGS & PANELS
- BP 09G – PAINTING & WALL COVERINGS
- BP 09H – FLOORING – WOOD ATHLETIC FLOORING
- BP 011A – FOOD SERVICE EQUIPMENT
- BP 011G – THEATER & STAGE EQUIPMENT
MACC 04 – Main Construction Bid Group 2:
- BP 03A – STRUCTURAL CONCRETE*
- BP 04A – MASONRY
- BP 04B – CMU
- BP 06B – CASEWORK & MILLWORK
- BP 07E – EXTERIOR SIDING – PRECAST PANELS
- BP 07F – EXTERIOR SIDING – METAL PANELS
- BP 08A – INTERIOR OPENINGS*
- BP 08D – ALUMINIUM, GLASS, & CURTAIN WALL
- BP 09A – FRAMING & DRYWALL
- BP 10Z – MISC. SPECIALTIES*
Sealed bids will be received by Renton School District and Skanska U.S.A. Building, Inc. for construction subcontracts to the GC/CM Contract between Skanska U.S.A. Building, Inc. and Renton School District for the above listed Scopes of Work.
Deliver sealed bids to:
Renton School District FOMC
7812 S 124th St,
Seattle, WA 98178
Attention: Josiah Mooi – Project Manager / Skanska USA Building
Bid Dates and Times are as stated below:
BID PACKAGES DUE DATES:
All bid packages in BID GROUP 1 – Due no later than 10:00AM on December 2nd, 2026 (12/02/2026)
All bid packages in BID GROUP 2 – Due no later than 10:00AM on December 3rd, 2026 (12/03/2026)
Bids will then be publicly opened and read aloud after the bid due time, in the order listed above in each Bid Group, with approximately five minutes break between each bid package. Bids received after the dates and times stated above WILL NOT receive consideration.
PRE-BID CONFERENCES
A non-mandatory, though highly encouraged pre-bid conference and site walk will be held for MACC 04 Main Construction Bid Group 1 & 2 Packages. Pre-Bid Meeting will begin at 10:00 am on 10/22/2026. The meeting will begin at the location described below.
Skanska Jobsite Office
710 S Second St.
Renton, WA 98057
Contract Documents for this work may be obtained online through Building Connected as well as Builder’s Exchange of Washington (www.bxwa.com) under Posted Projects/General Contractor Project areas/Washington/Skanska/Projects Bidding. They will be available Thursday, October 15, 2026.
Questions that develop during the bid period must be submitted in writing and or emailed to Skanska USA Building, Inc. to Josiah.Mooi@skanska.com All questions and answers will be published via addenda during the bid period. Questions must be received no later than 1:00 PM on 11/12/2026. DO NOT present questions directly to the Architect/Engineer or the School District.
BUSINESS EQUITY: The project is committed to providing the maximum practicable opportunity for participation in contracting by small business entities and disadvantaged business enterprises. That commitment includes maximizing opportunity for state-certified minority business enterprises (MBEs) and women business enterprises (WBEs) on public works construction projects (collectively referred to as MWBEs). Participation may be either on a direct basis or as a subcontractor or supplier.
RETENTION: Skanska plans to obtain a Retention Bond for the project. Subcontractors will have the option of participating in the Skanska a retention bond in lieu of having retention held. Those who do not participate will be held to the standard 5% retention.
Skanska USA Building, Inc. reserves the right to reject any or all bids and to waive any non-material informalities or irregularities in the bids received. A bidder may withdraw its proposal by submitting a written request before the bid opening time. Skanska will return the proposal unopened after contract award.
* Skanska intends to submit a bid on this bid package
Scope of Work: Main school building concrete structure, all interior bid packages and mechanical/plumbing/electrical.
Solicitation documents: Solicitation documents, contacts and bid instructions are available at: www.bxwa.com
Organization: Skanska USA INC
Point of Contact:
Name: Josiah Mooi
Email: josiah.mooi@skanska.com
Phone: 2064549519
Pre Bid Meeting Details: Pre-Bid Meeting will begin at 10:00 am on 10/22/2026. The meeting will begin at the location described below.
Skanska Jobsite Office
710 S Second St.
Renton, WA 98057
Other Details:
NOTE: These postings are from third parties and are listed as a courtesy. Posts you see here are posted as a courtesy only.