SUBCONTRACTING OPPORTUNITY
Skanska Portage Bay Bridge Bid Opportunity – RFP 027 Demolition
POSTING DATE: 12/12/2024
DEADLINE FOR SUBMITTING BIDS: 01/02/2025
Contract Location: Portage Bay Bridge
Contract description: Project: SR520 Portage Bay Bridge Replacement
Owner: Washington State Department of Transportation (WSDOT)
RFP: 27 Demolition
Bids Due: January 2, 2025 by 12:00pm
Skanska is soliciting all interested subcontractors and suppliers, as well as certified Small, Veteran, Minority & Woman owned companies for the bid package listed below.
RFP 027 Demolition
All relevant project information including plans and specifications can be found in the documents on BuildingConnected. Plans and specifications are available for viewing at our office by appointment, contact Khelsey Wilder to schedule or download free in BuildingConnected. Please return your bid and submit RFIs on BuildingConnected. If you need assistance getting access to BuildingConnected feel free to contact Khelsey Wilder at khelsey.wilder@skanska.com or 206-798-2846.
This project has 5% SBE, 3% VOB, 10% MBE and 6% WBE participation goals. Skanska intends to conduct itself in good faith with all interested subcontractors as well as certified SBE/VOB/MBE/WBE firms looking for subcontract opportunities on this project. If you are a SBE/VOB/MBE/WBE firm, please provide your certification with your proposal. All interested subcontractors, please indicate all lower tier SBE/VOB/MBE/WBE participation offered on your proposal as it will be evaluated with your price.
Skanska will assist qualified subcontractors, vendors, & suppliers in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. To permit maximum participation, when feasible Skanska will review breaking out scope packages and adjusting schedules to help permit maximum participation of SBE/VOB/MBE/WBE on the project. Subcontractor may be requested to furnish a bond, if required Skanska will pay bond premium up to 1%.
Please call if we can assist you in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies.
Skanska is an EEO/AA/Vet/Disability Employer. On behalf of the Skanska team, thank you for your interest in our project.
Register for an e-newsletter of future bid opportunities at https://bit.ly/PNW_interestedbidders
About the Project
Skanska has been awarded the SR 520, I-5 to Montlake – I/C and Bridge Replacement project in Seattle, Washington. This project will replace the existing Portage Bay Bridge, with two new parallel variable depth segmental box girder bridges across Portage Bay, the existing SR 520 eastbound off-ramp structure to Montlake Boulevard East, the existing 10th Ave E and Delmar E under-crossings with a new Roanoke Lid Bridge, and provide approximately 75 retaining walls. This project will also extend the SR 520’s transit/HOV system from Montlake to I-5 and the cross-lake bicycle and pedestrian trail over Portage Bay to a new lid between Delmar Drive East and 10th Avenue East.
If you have questions, please contact the project inclusivity manager, Suzanne Arkle 720-324-8580 suzanne@zanninc.com
Scope of Work: Demolition
Solicitation documents: Solicitation documents, contacts and bid instructions are available in WEBS:
Point of Contact
Name: Khelsey Wilder
Email: khelsey.wilder@skanska.com o
Phone:(206) 798-2846
Links: https://bit.ly/bidportagebay