NOTICE OF BID OPPORTUNITY
NE 85th St Ped-Bike Connection 114th Ave NE to 6th St
COMPETITIVE SOLICITATION POSTING: 01/10/2025
DEADLINE FOR SUBMITTING BIDS: 02/05/2025
Find the full solicitation on The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for constructions of the NE 85th St Ped-Bike Connection 114th Ave NE to 6th St. Specific work includes, but is not limited to the improvement of NE 85th St from 6th St to 114th Ave NE including clearing and grubbing, traffic control and maintenance of traffic, temporary erosion and sediment control, construction of curbs, asphalt concrete paving, concrete paving, landscape buffer construction, sidewalk, retaining walls, storm drainage pipe, catch basins, traffic signal upgrades, illumination, channelization, signing, and other work. The estimated cost for this project is in the range of $8,700,000 to $9,600,000.
Contract Location: City of Kirkland
Contract description: The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for constructions of the NE 85th St Ped-Bike Connection 114th Ave NE to 6th St. Specific work includes, but is not limited to the improvement of NE 85th St from 6th St to 114th Ave NE including clearing and grubbing, traffic control and maintenance of traffic, temporary erosion and sediment control, construction of curbs, asphalt concrete paving, concrete paving, landscape buffer construction, sidewalk, retaining walls, storm drainage pipe, catch basins, traffic signal upgrades, illumination, channelization, signing, and other work. The estimated cost for this project is in the range of $8,700,000 to $9,600,000.
Solicitation documents: Solicitation documents, contacts and bid instructions are available in WEBS: The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for constructions of the NE 85th St Ped-Bike Connection 114th Ave NE to 6th St. Specific work includes, but is not limited to the improvement of NE 85th St from 6th St to 114th Ave NE including clearing and grubbing, traffic control and maintenance of traffic, temporary erosion and sediment control, construction of curbs, asphalt concrete paving, concrete paving, landscape buffer construction, sidewalk, retaining walls, storm drainage pipe, catch basins, traffic signal upgrades, illumination, channelization, signing, and other work. The estimated cost for this project is in the range of $8,700,000 to $9,600,000.
Organization: City of Kirkland
Value: $8,700,000 to $9,600,000
Point of Contact:
Name: Jay Gewin
Email: jgewin@kirklandwa.gov
Phone:(425) 587-3123