Spee West invites contractors to attend two events for the Mariner High School Remodel and Addition Project.
Pre-Bid Meeting is 1/18 at 2:30pm. Meeting will be held in the library
Outreach Meeting is Monday, 1/23 from 4:30pm – 6pm. Meeting will be held in the commons
Both meetings will be at Mariner High School Library
200 -120th St SW Everett, WA
Please use the entrance off 120th ST SW
RSVP | Email: Outreach@speewest.com
BIDDERS are encouraged to attend pre-bid meeting, but is not mandatory
The Mariner High School Remodel and Addition Project consists of a new two story 29,797 s.f. student center, office, and library addition to the existing Mariner High School. The scope includes the abatement and demolition of select portions of the existing building, structural upgrades to existing and a campus wide fire alarm replacement in addition to the new structure. Site improvements include utility improvements, a student courtyard and new synthetic turf baseball/softball infields. The school will remain in operation during construction. Small, Minority & Local contractors encouraged to bid.
Plans and Specifications: Mariner High School Renovation & Addition – Multiple Bid Packages, Mukilteo School District, Everett, WA (bxwa.com)
