Washington APEX

How Do I...?

Sell to the Government

Locations

Where We Are

Calendar

Events and Workshops

Washington APEX Accelerator

MENU

Fish Passage Project

                                     I-90, SR 161, SR 202, & SR 203 Fish Passage Project

Owner: Washington State Department of Transportation

Bid Date: August 31, 2022 @ 11:00 AM (PDT)

Quotes Due by: August 24, 2022 @ 5:00 PM (PDT)

Scope Letter by: August 17, 2022 @ 5:00 PM (PDT)

CONTACT:

Bart Happer

KIEWIT INFRASTRUCTURE WEST CO.

33930 Weyerhaeuser Way S

Federal Way, WA 98001

PH: (253) 943-4200   FAX: (253) 943-4201

Email: NW.Estimating@kiewit.com and bart.happer@kiewit.com    

This Project will remove existing barriers to fish migration at six (12) I-90, SR 161, and SR 202/203 stream crossings and replace the water crossings with fish passable structures.

Conceptual Plans and specifications can be accessed from the WSDOT website at :

https://wsdot.wa.gov/business-wsdot/contracting-opportunties/i-90-sr-161-sr-202-sr-203-fish-passage

Services and supplies being solicited include: aggregate; concrete curb, gutter, sidewalk; drainage pipe; erosion and sediment control geotextiles; elastomeric bearing pads; expansion joints; equipment rental;; guardrail; guide posts; girders; haul (truck); hot mix asphalt paving; landscape; `MSE walls; pavement markings; permanent signs; precast concrete drainage structures; ready-mix concrete; rebar; single slope concrete barrier; street sweeping; survey; tire wash; traffic control; storm water treatment; vacuum truck. Design elements include technical reports/memoranda, design survey, geotechnical testing and engineering, utilities investigation and design, pavement design, structures design (bridges and retaining walls), drainage design, stormwater/water quality management plans, wetland mitigation and stream restoration design, landscape architecture and design, civil roadway design, traffic engineering, lighting design, and Quality Assurance (QA).

In order to assist certified Minority, Small, Veteran, and Women Business Enterprise Contractors and Suppliers, we will divide items of work into smaller tasks or quantities and establish delivery and construction schedules which will permit maximum participation where feasible.

Kiewit supports providing the maximum practicable opportunity to the SVBE & MWBE small business subs & suppliers to compete for and participate in subcontracts let by Kiewit for this WSDOT project.

We are an Equal Opportunity Employer

Get Latest News & Updates

News and announcements will be delivered straight to your inbox