Project Schedule
Planning Completed: 2018
Design Completed: 2019
Right of Way Completion: Winter 2021
Construction Begins: Spring 2022
Duration: One Year (pending Sound Transit Schedule)
Project Description
The Links to Opportunity (LTO) project will enhance the corridor along sound Transit’s Hilltop Tacoma LINK extension route to increase accessibility and safety for residents and businesses. The project serves one of Tacoma’s oldest historically Black neighborhoods and business districts, and the design was informed by nearly two years of grassroots outreach to the Hilltop community. Downtown: On the Go!, Hilltop Action Coalition, and Tacoma Housing Authority all assisted in the outreach effort. The final design is informed and defined by the community that it will serve and will honor the history of the corridor.
Learn more about the project here – City of Tacoma Project Webpage
Links To Opportunity Project Flyer
Project Scopes
237110, 562119, 541370, 561730, 541360, 238910, 237310 – Preparation & Grading
- Surveying
- Site Demolition, Saw Cutting and Cleanup
- Concrete Removal – Sidewalks, Stairs, Walls
- Removal and Relocation of Site Features
- Clearing and Landscape Removal
- Adjusting Utilities to Grade
237110, 237130 – Drainage and Storm Sewer
- Schedule A Storm Sewer Pipe 3-in Diameter for Roof Drains
- Trench Drains
- Controlled Density Fill
- Installing Manhole
237110, 238990, 237310, 453998, 561990, 238210 – Paving and Traffic
- Installing Base Course Materials
- Installing standard and Colored Concrete Sidewalk
- Sandblasting Decorative Strips
- Installing Plastic and Painted Traffic Lines and Symbols
- Traffic Control and Signage
- HMA Paving for Sidewalks
238210 – Illumination
- Surveying
- Site Demolition, Saw Cutting and Cleanup
- Concrete Removal – Sidewalks, Stairs, Walls
- Removal and Relocation of Site Features
- Clearing and Landscape Removal
- Adjusting Utilities to Grade
561730 – Erosion Control, Roadside Planting
- Tree Protection
- Root Barrier
- Installing Small, Medium and Large Plants and Trees
- Mulching, Seeding and Fertilizing
- Installing Irrigation
238990 – All Other Specialty Trade Contractors
- Installing Fencing
- Streetscape Features including Benches, Lean Rails, Seats, Chess Board
- Bicycle Racks and Corrals, Repair Station
- Pavers, Interpretive Text, Welcome Mats
Contact Information
For more information, reach out to Jon Kulju, City of Tacoma Project Manager.
253-591-5204 JKulju@cityoftacoma.org
Hosted by MBDA-Washington Business Center & Equity in Contracting-City of Tacoma