PROJECT NAME: SR 305 Bainbridge Ferry Terminal OHL Walkway Replacement and Cab in Kitsap County, Washington
BID #: Contract #9737
BID DUE DATE: 12/01/2021 @ 11:00
AWARDING AGENCY/OWNER: Washington Department of Transportation
PROJECT LOCATION: Seattle, Kitsap, WA
Requested scopes include, but are not limited to the following and should be based on Contract and its amendments:
- Demolition & removal
- hazardous material disposal
- bar reinforcing steel
- ready mix concrete
- bridge bearings
- signage
- waterproofing
- steel pipe pile
- driven pile
- structural steel fabrication and erection
- welding
- fiber reinforced polymer bridge decking
- aggregates
- HMA paving
- erosion control
- striping
- survey
- biological monitoring
- electrical
- mechanical systems
- glazing
- door assemblies
- handrail
- painting
- fire sprinkler protection
- heating system
- traffic control materials
- concrete pumping
- trucking
Plans and Specifications are available through registering on our plan site at: https://app.buildingconnected.com/projects/61817bad845c1a00c335d399/bid-packages
Subcontracting Requirements: Skanska is an Equal Opportunity Employer and is requesting quotes from all qualified subcontractors and suppliers. All interested subcontractors, please indicate all lower tier DBE participation offered on your quotation as it will be evaluated with your price.
Skanska will assist qualified subcontractors, vendors, & suppliers in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies.
If you are a DBE firm, please provide your certification letter with your proposal; Skanska will also review breaking out scope packages and adjusting schedules to help permit maximum participation. when feasible.
Skanska’s insurance requirements are Commercial General Liability (GL): $1M ea. occ., $1M personal injury, $2M products & completed operations agg. & general agg.; $1M Auto Liability; $5M Excess/Umbrella and $1M Workers Comp. Endorsements and waivers required are the Additional Insured End., Primary Wording End., & a Waiver of Subrogation (GL & WC). Other insurance requirements may be necessary per scope or RFP requirement.
Subcontractors may be required to furnish performance & payment bonds in the full amount of their subcontract by an admitted surety & subject to approval by Skanska.
Quotations must be valid for the same duration as specified by the Owner for contract award. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing.
Skanska is signatory to the Operating Engineers, Laborers, Cement Masons, & Carpenters Unions. Subcontractors must provide weekly, one original and one copy of all certified payrolls, including non-performance and fringe benefit statements if required by law or by the Prime Contract.
Skanska USA Civil West California District is an Equal Opportunity/Affirmative Action Employer
EEO/AA/Vet/Disability Employer
Estimating Department: 1995 Agua Mansa Rd, Riverside, CA 92509
Phone: (951) 684-5360
Lead Estimator: Jeanine Soriano Email: bids.socal@skanska.com
